SPACERANGER—WJ300GS_千亿国际首页 SPACERANGER—WJ300GS_千亿国际首页

千亿国际首页

Location : Home >> News >>Company News

SPACE RANGER—WJ300GS

From:     Inputtime:2014-03-11 08:54:16

WJ300GS isone kind of our company’s new motorcycles with space ranger series. Compared toother types of motorcycles, it has ten characteristics.

First, dominatingappearance, cool modeling, giant structure are its basicadvantages. Besides, the whole motorcycle plastic parts are made of ABSmaterial imported from Taiwan, so its texture is far beyondordinary one. 

Second, digital ignition, more plentiful energy, smaller vibration,less fuel-cost, energy saving and environmental-friendly are the other chieffeatures of our new motorcycles.

Third,flexible leather saddle contributes to comfortable riding experience.

Fourth,front shock absorber is adjustable, that will make you feel more convenientwhen it’s at high speed level.

 

Fifth, it has displacement of 300cc,equipped with single-cylinder water-cooled four stroke engines, so fastercooling and smaller oil-cost occur.

Sixth, two huge headlights and multi-levelbi-color LED turn signal help us drive safely.

Seventh, digital LCD instrument letus get all kinds of data directly.

Eighth, tremendous fuel tank of16L gives us longer driving time.

Ninth, as it utilizes doubleplates before and after the brake, our new motorcycle’s brake system is moresensitive. It’s much safer to skid after high speed riding.

At last, double row, high exhaustmuffler structure dramatically reduces exhaustingresistance and enhancing its power.

    Hey, fellows, come on and take it home! Itwill make your life more exciting!

 

 

Copyright © all rights reserved.
Address: Chongqing city Shapingba District wellhead Nanxi economic Park 渝ICP备17000613号 Deign by: RXCN
Click on the link I
e世博官方网的微博德赢app苹果下载德赢app苹果下载